Sl. No. |
Types of Equipment |
Total (Nos.) |
---|---|---|
1 |
Excavator |
25 |
2 |
Soil Compactor |
19 |
3 |
Tendom |
2 |
4 |
JCB |
10 |
5 |
Loader |
4 |
6 |
Hydra |
7 |
7 |
Motor Grader |
16 |
8 |
DG |
14 |
9 |
Tipper |
104 |
10 |
Transit Mixer |
10 |
11 |
Tractor |
8 |
12 |
Forklift |
3 |
13 |
Bitumen Sprayer |
2 |
14 |
Diesel Tanker |
6 |
15 |
Water Tanker |
20 |
16 |
Mixture Machine |
1 |
17 |
RMC Plant |
2 |
18 |
Mesto Crusher |
2 |
19 |
DBM Plant |
1 |
20 |
RE Block & RE Pannel making machine (Apollo Brick Plant) |
2 |
21 |
WMM Plant |
1 |
22 |
Piling Rig |
1 |
23 |
Gantry Crane |
1 |
24 |
Steel Bar Cutter |
1 |
25 |
Trailor |
4 |
26 |
Weighbridge |
2 |
Total |
268 |
As per actual site condition |
|||||
---|---|---|---|---|---|
Sl. No. |
Description |
|
Length (km.) for BHS |
% |
Remarks |
1 |
Total Length of the Project |
A |
45.159 |
100.00% |
|
2 |
PROW yet to be Hand over |
B |
6.860 |
15.19% |
As per Annexure-A |
3 |
Works has been stopped by the farmers / Local Villagers due to Land Acquisition issues etc. |
C |
9.000 |
19.93% |
As per Annexure-B |
4 |
Length effected due to Religious Structures |
D |
0.350 |
0.78% |
As per Annexure-C |
5 |
Length effected due to various Structures / Obstructions in handed over Length |
E |
7.154 |
15.84% |
As per Annexure-D |
6 |
Total Hindrance free land yet to handover to the Concessionaire |
F |
23.364 |
51.74% |
B+C+D+E |
Work Status as per Availability of Hindrance Free Land